Energy infrastructure · Canada · 23 October 2025

A schematic, not a live project. The drawing shows how a project is represented as a single line from source to demand, with a contract settlement layer beneath it.

Before thepower flows.

A project does not begin with steel. It begins with promises about price, volume, risk and time that must hold long before a single electron moves.

Two explainers · One price tool · About 20 min

Continue to the premise

Schematic. Not a real project, site or contract. Public sources, cited.

01/The premise

A project is a promise before it is a line.

7 min read · Editorial

A power line is a physical fact. Before it exists, it is a set of promises: that a site can be permitted, that steel will arrive on schedule, that a buyer will pay an agreed price, that a lender will be repaid, that a community will tolerate the work. Each promise is made by someone, priced by someone, and broken at someone's cost.

Energy infrastructure is capital-heavy and slow. The expensive decisions happen years before revenue, and the risks do not arrive one at a time. They arrive as a permit delay while the interest clock runs, a transformer that ships late, a price that moves against the case, a policy that changes after the contract is signed.

This project follows the sequence — proposal, screening, structuring, construction, operation — and asks the same two questions at every stage: what has to be true, and who carries the cost if it is not?

Why the Canada Growth Fund

The frame comes from two public documents from the Canada Growth Fund: its investment strategy, and its Corporate Plan Summary 2026–2030, whose information is current as of 23 October 2025.1 The fund is described as a $15 billion independent investment fund operating at arm's length from the Government of Canada, managed by CGF Investment Management, a wholly owned subsidiary of PSP Investments. It invests through equity, debt, hybrid instruments, offtake contracts and contracts for difference. It states that it does not provide grants or subsidies, and that it expects to recover its capital on a portfolio basis.

The contracts are the interesting part. A contract for difference does not buy or sell the commodity. It exchanges the difference between a reference price and a fixed strike price for an eligible volume. When the reference is below the strike, the provider pays the holder; when it is above, a two-way contract reverses the payment. One equation moves a large amount of risk — and creates a new set of questions.

This is an explainer, not a prospectus. No project, partner, return or incident is invented here. Where the public record stops, the text says so.

15
$ bn

Fund described in the plan

Independent, arm's length

16
deals

Transactions announced

As of October 2025

7
$ bn

Contract tail-risk limit

Aggregate net exposure

As reported in the Corporate Plan Summary 2026–2030. Not live data.

02/The stage

Five stages. One balance sheet at the end.

A project is not approved once. It is approved repeatedly, by different people, with different information and different exposure. Select a stage to see what has to be true, who carries the risk, and what is still unresolved.

Editorial sequence, not a specific transaction. Stages overlap in practice.

Stage 01 / 05

Months to years

An intention becomes a file.

A project starts as a claim about the future: a technology, a site, a volume, a price. Nothing is built. The first task is to turn the claim into something another party can underwrite.

What changes

Uncertainty is at its widest, and information is cheapest to gather.

What must be true

  • The technology has been proven in pilots but is not yet widely adopted - the category the fund describes as Projects.
  • Activity happens in Canada, strengthens a Canadian value chain, or keeps Canadian intellectual property in the country.
  • There is a plausible path to private capital that would not arrive on the same terms without a public participant.

Where the money is

Development capital, spent before any revenue exists and usually lost if the project stops.

Who carries what

Project
Site control, permits, engineering, early development costs.
Capital
Usually absent at this stage; the risk is too early to price.
Public
May read the file, but has committed no capital and contracted no revenue.

Questions still open

  1. What exactly is being promised: price, volume, schedule, or all three?
  2. Which risk has no private buyer at any reasonable price?
  3. Would the project exist without public participation? If so, why is it here?

Basis: CGF Investment Strategy · CGF Corporate Plan Summary 2026-2030

Source basis: Canada Growth Fund, Corporate Plan Summary 2026–2030, and Our Investment Strategy.

"Commitment" and "deployment" are used in the sense set out in the plan's financial overview: a commitment is an agreement to invest; a deployment is the funding of a prior or concurrent commitment. The distinction matters because a headline number is not money that has left.

03/Close inspection

Read the drawing.

A project is usually presented as one line. In practice it is six responsibilities, each with its own failure mode and its own contract. Select a part. Notice that the settlement layer is not electricity.

Fig. 03 / One line, six responsibilities

Not to scale

The dashes are money, not electricity. The bus is a drawing convention, not a site plan.

Part 01 / 06

Generator

What it does
Turns fuel, heat or kinetic energy into electricity. The whole case rests on how much it produces, how reliably, and at what emissions intensity.
What can go wrong
Underperformance, outages, and emissions above the design case - the distance between a promised asset and a delivered one.
What the contract asks
Performance guarantees, commissioning tests, availability commitments, and the measurement standard that decides whether they were met.

Editorial description. No claim about a specific project, site or contract.

04/The reading room

Two ways to read the machine.

The opening shows the sequence. The two explainers slow it down: first who carries the risk, then how the contract turns a promise into something a lender can underwrite.

The equation

payment = (strike − reference) × volume

Below the strike, the provider pays. Above it, a two-way contract reverses.

Open the tool

05/Sources & dates

The record, and where it stops.

This edition is built from two public documents, read closely and cited by section. Figures are reported as they appear in those documents; nothing is updated, modelled or described as live.

The project stages and the two explainers are editorial synthesis. Where they describe typical project-finance practice, they say so. Where the public record is silent, they say that too.

Independence

SignalPath Index is an explanatory editorial project built from public documents. It is not an official publication of the Canada Growth Fund, Canada Growth Fund Investment Management, PSP Investments or the Government of Canada, and nothing here is investment, legal, tax or accounting advice.

End/End of the opening

The rest is the reading.

Two explainers and one instrument. Everything is sourced, dated and labelled. Nothing here is a live project or an offer.